![]() ![]() Listen for an audible click to ensure a good connection. Complete the first two rows of main beams by hanging main beams from the hooks and joining their ends together. Installing remaining grid & leveling the systemġ. Joists will need to be located and marked.ĭ. When installing below an existing drywall ceiling, a minimum 4" drop is required to install panels. Consult the light manufacturer’s instructions for details. Installations with light fixtures will likely require additional clearance and support. To allow for ceiling tile installation and accessibility, the minimum drop is 3" with traditional hanger wire. Watch a video about ceiling layout considerations. If your room configuration is unusual, you may require additional components. ![]() ![]() Main beams are typically installed 4’ on center. Main beams should be installed perpendicular to the joists. Always cut mineral fiber or fiberglass ceiling panels face up with a sharp utility knife.į. Keep hands clean to avoid smudges on the finished ceiling.Į. Do not apply loose fill or batt insulation so that it rests directly on the panels.ĭ. Never install ceiling panels below an existing ceiling that contains embedded radiant-heat coils. Remove panels from the cartons 24 hours before installation and allow them to adjust to normal interior conditions of the area where installation will take place.Ĭ. Store and install panels in areas with temperature and humidity ranges that meet specific product warranty requirements.ī.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |